Loading...

Devoted to research, the Chemistry & Biochemistry Building houses offices, an intimate auditorium, informal gathering spots, and laboratories that are used by faculty, graduate students and many undergraduate students.

Completed in 2007, the four-story building covers 89,613 square feet between Montana Hall and the Johnstone Center. Fourteen-foot ceilings accommodate ducts, water pipes and light fixtures.


 Chemistry & Biochemistry Bldg

Handicapped accessible

Upcoming events in Chemistry & Biochemistry Bldg

PhD Defense in Biochemistry - Jessica Lusty Beech
Monday, April 1, 2024 at 12:30pm

Jessica Lusty Beech will defend her PhD in Biochemistry beginning with a seminar titled "Quantifying Structure and Functional Limitations of Enzymes Involved in Bioconversion of Poly(ethylene terephthalate)" in the CBB Byker Auditorium.   View Details

Dr. Ruth Welti, Division of Biology, Kansas State University, will present a seminar titled "Using Mass Spectrometry-based Lipidomics to Gain Insight into Plant Lipid Metabolism." Abstract: Faced with environmental challenges, plants alter their lipid compositions, adjusting their membrane compositions to suit the...   View Details

ESCI Ph.D. candidate Behnaz Hosseini will be presenting on “Are we recording? Putting embayment speedometry to the test using high pressure-temperature decompression experiments”   View Details

PhD Defense in Chemistry - Heidi Koenig
Friday, April 5, 2024 at 3:10pm

Heidi Koenig will defend her PhD in Chemistry beginning with a seminar titled "Synthesis and Biological Evaluation of Novel Antimicrobial Agents for the Control and Eradication of Pathogenic Biofilms." Abstract: Multi-drug resistant (MDR) bacteria that possess the propensity to form biofilms have...   View Details